Sule Shangri-La Extension Project
66/33kV, 30MVA Transformer and 66kV GIS Installation
66/33kV, 30MVA Transformer and 66kV GIS Installation
66/33kV, 30MVA ONAF Outdoor Type Transformer ( Siemens )
66kV CRP Panel Installation
33kV 1 Incoming 4 Outgoing AIS Panel
66kV, 1C x 400mm2 Cable ( GIS Plug In ) Termiantion at Sending Side
66kV, 1C x 400mm2 Cable ( GIS Plug In ) Termiantion at Sending Side
33kV, 1C x 400mm2 Cable Termination ( Cold Shrink Termination )
33kV, 1C x 400mm2 Cable Termination ( Cold Shrink Termination )
Cable Laying With Concrete Duct Method
Cable Laying With Concrete Duct Method
i-Land Industrial Park Project ( Bago Division )
11kV Overhead Line and 11/0.4kV, 250kVA OLTC Package Type Transformer Installation
11/0.4kV, 750kVA OLTC Package Type Transformer Installation
12M Concrete Pole Erection For 11kV SAC Overhead Line
11kV SAC Overhead Line Installation
11kV SAC Overhead Line For Yangon – Mandalay Highway Road Crossing
FAT at AGE Transformer Factory
Yangon Airport Extension Project
MPT Telecommunication Tower Power Access Project ( Ayeyarwady Division )
11/0.4kV, 50kVA Pole Mounted Transformer Installation
11/0.4kV, 50kVA Pole Mounted Transformer Installation
11kV ACSR Overhead Line Installation
11kV ACSR Overhead Line Installation
Telenor Telecommunication Tower Foundation and Erection ( Dawei, Tanintharyi Division )
Telenor Telecommunication Tower Foundation
Telenor Telecommunication Tower Erection
Hmaw Bi Pharmaceutical Factory Renovation Project
Main Distribution Board Renovation
Sub Distribution Board Installation
Internal Electrical Design and Installation
Bahosi Housing Project
11-6.6/0.4kV, 200kVA OLTC Package Type Transformer Installation
Kan Daw Gyi Garden Housing Project
Internal Electrical Installation (M3, M4 Building)
Internal Electrical Installation (M9, Y1 Building)
Internal Electrical Installation (MS 3, MS 4 Building)
Sule Plaza Project
Internal Electrical Installation
Internal Electrical Installation
Internal Electrical Installation
Internal Electrical Installation